What does a sand trap drainage channel do?
It captures sand carried from the landing pit and directs surface water into the drainage line, controlling sand migration and standing water at the same edge detail.
How is the sand trap channel cleaned?
The removable grate is lifted, trapped sand is taken out and the channel body is flushed toward the outlet. Maintenance frequency depends on use and site conditions.
Are CAD drawings available for the sand trap drain?
Yes. DXF files for the channel body, grate and side cover, plus an English placement plan, are available in the technical files section on this page.
What load class does this product support?
SFS Drain channels are designed for load class A15 (pedestrian and light traffic) per EN 1433, suitable for athletics track operating conditions. Contact our engineering team for project-specific load requirements.
What material are the channels and covers made of?
All channel bodies, covers, and inspection chambers are made from composite material. The composite structure offers light weight, corrosion resistance, and long-term performance.
What is the typical installation time?
On-site installation of a single channel unit, including placement, alignment, and haunching, takes approximately 8-12 minutes. Do not backfill until the C20/25 concrete haunching has cured.
What is the product warranty?
SFS Drain products carry a standard 2-year manufacturer warranty against defects. Under correct installation and load conditions, product life exceeds 20 years.