Sand Pit Drainage Detail

Sand trap channel and removable grate detail for jump pit edge drainage and sand control.

Planning Window Project based
Drainage Focus Project based
Document State VERİFIED
Install Review Jump Pit Edge

Technical Approach

Phase 01 - Layout

Define channel lines around the sports surface, coordinate outlet points and reserve maintenance access before construction drawings are frozen.

Phase 02 - Product Match

Match straight channels, radius covers, sand-trap units and inspection chambers to the relevant site zone and expected loads.

Drawing Set
SLOT_FLOW: Project based
System Line
Jump Pit Edge
Review Status
CHANNEL LINE READY
format_quote

"The correct drainage detail is selected before the surface system is installed, not after water problems appear."

person

SFS Drain Engineering

Specification Note

Resources

  • CAD Drawings download
  • Product Catalog download
Drawing Coordination

Plan the drainage line before the surface is closed

Use the DXF/DWG downloads to coordinate channel body, cover, inspection and sand-trap details with project drawings.

Open Documentation

System Modules

Module Status Load Site Note
STRAIGHT_CHANNEL ACTIVE TRACK STRAIGHT FLUSH COVER
RADIUS_CHANNEL ACTIVE CURVE SECTION RADIUS COVER
INSPECTION_CHAMBER ACTIVE OUTLET POINT SERVICE ACCESS
SAND_TRAP_CHANNEL ACTIVE JUMP PIT EDGE REMOVABLE GRATE