SFS DRAIN
TRACK DETAIL TRACK_EDGE_01

Athletics Track Drainage Layout

Straight and radius channel coordination with cover, inspection chamber and sand trap details for a complete track edge drainage line.

Planning Window Project based
Drainage Focus Project based
Document State VERİFIED
Install Review Athletics Track

Technical Approach

Phase 01 - Layout

Define channel lines around the sports surface, coordinate outlet points and reserve maintenance access before construction drawings are frozen.

Phase 02 - Product Match

Match straight channels, radius covers, sand-trap units and inspection chambers to the relevant site zone and expected loads.

Drawing Set
SLOT_FLOW: Project based
System Line
Athletics Track
Review Status
CHANNEL LINE READY
format_quote

"The correct drainage detail is selected before the surface system is installed, not after water problems appear."

person

SFS Drain Engineering

Specification Note

Resources

  • CAD Drawings download
  • Product Catalog download
Drawing Coordination

Plan the drainage line before the surface is closed

Use the DXF/DWG downloads to coordinate channel body, cover, inspection and sand-trap details with project drawings.

Open Documentation

System Modules

Module Status Load Site Note
STRAIGHT_CHANNEL ACTIVE TRACK STRAIGHT FLUSH COVER
RADIUS_CHANNEL ACTIVE CURVE SECTION RADIUS COVER
INSPECTION_CHAMBER ACTIVE OUTLET POINT SERVICE ACCESS
SAND_TRAP_CHANNEL ACTIVE JUMP PIT EDGE REMOVABLE GRATE